Bibra Tunnel, Germany
The Project:
The Bibra Tunnel is part of the German Unity construction project No. 8, the extension stretch on the route Nuremberg-Erfurt-Leipzig-Halle- Berlin.
Company involved:
Marti Tunnelbau Bunte
The Problem:
Maintaining water clearance by means of submersible pumps at the tunnel portals and during the tunnel advance.
The Solution:
Use of Tsurumi dirty water submersible pumps of widely differing types to remove water from the tunnel. Thanks to their tough, robust design, and the special internally-located slide-ring seal, Tsurumi pumps can be kept permanently in operation in "on-snore-mode".
No caso de uma utilização abrasiva e corrosiva, certos componentes sofrerão um desgaste natural. No que respeita à aplicação anterior, o desgaste pode decorrer sobretudo no impulsor, agitador, placa de sucção, manga do veio, anel de óleo, vedação mecânica, revestimento da bomba, filtro, revestimento do motor e acoplamento de descarga. Dependendo das condições de trabalho, a vida útil daquelas peças pode variar significativamente e pode ser mais reduzida do que o período legal da garantia.
A este propósito, atente aos nossos
termos e condições gerais que também lhe enviamos por email, se solicitado.