The Project:


Underground railway track to link the Cologne/Bonn Airport, Germany

Executing companies:

Consortium airport link Cologne/Bonn lot 3

Wayss&Freytag AG, E. Heitkamp GmbH,

Bauer Spezialtiefbau GmbH, F.C. Trapp AG


The Problem:


A DB400 sewage water pipeline has to be installed through the progressing soil excavation.


Our Solution:


To re-pump the dirty water generated, submersible pumps for abrasive water of the types KRS65.5 and KTZ45.5 were installed in the existing shaft. Installation includes all hose connections and the emergency generator.

No caso de uma utilização abrasiva e corrosiva, certos componentes sofrerão um desgaste natural. No que respeita à aplicação anterior, o desgaste pode decorrer sobretudo no impulsor, agitador, placa de sucção, manga do veio, anel de óleo, vedação mecânica, revestimento da bomba, filtro, revestimento do motor e acoplamento de descarga. Dependendo das condições de trabalho, a vida útil daquelas peças pode variar significativamente e pode ser mais reduzida do que o período legal da garantia.
A este propósito, atente aos nossos termos e condições gerais que também lhe enviamos por email, se solicitado.