Direkt zum Inhalt | Direkt zur Navigation
Encontra-se aqui:

Statentunnel, Netherlands

The Project:


Expansion of the Erasmus railway line between Rotterdam and The Hague.


Executing company:

Ed. Züblin AG

DuraVermeer Groep NVn


The problem:


Using a hydroshield, two 2.3km tunnels with diameter 6.78m will be constructed.During building works the lowering of the groundwater level must be assured.


The solution:


Multiple submersible pumps from the KTV and KTZ series. The special characteristics of Tsurumi pumps, such as an internal mechanical seal, upstream shaft sleeve with gasket and an oil lifter allow them to be used in on-snore-mode over an extended period.

No caso de uma utilização abrasiva e corrosiva, certos componentes sofrerão um desgaste natural. No que respeita à aplicação anterior, o desgaste pode decorrer sobretudo no impulsor, agitador, placa de sucção, manga do veio, anel de óleo, vedação mecânica, revestimento da bomba, filtro, revestimento do motor e acoplamento de descarga. Dependendo das condições de trabalho, a vida útil daquelas peças pode variar significativamente e pode ser mais reduzida do que o período legal da garantia.
A este propósito, atente aos nossos termos e condições gerais que também lhe enviamos por email, se solicitado.