NoordZuidLijn, Amsterdam, Netherlands

The Project:


Expansion of underground network in Amsterdam; construction of north-south line


Executing companies:

Max Bögl

ARGE Saturn (DuraVermeer and Züblin)

Distrimex b.v.


The problem:


The NordZuidLijn will be a new underground railline crossing Amsterdam from north to south.Amsterdam is situated at sea level, with many canals running through the city and historic sites that require protection. For these reasons, the lowering of the ground water during construction work must be carefully planned; this applies in particular during the building of the Rokin, Vijzelgracht and Ceintuurbaan stations in the city centre. Completion is expected to be in 2013.


The solution:


KTZ and KTV series pumps lower the groundwater during construction work on the underground stations and tunnels. Multiple pumps are kept on standby or are in mobile use.

No caso de uma utilização abrasiva e corrosiva, certos componentes sofrerão um desgaste natural. No que respeita à aplicação anterior, o desgaste pode decorrer sobretudo no impulsor, agitador, placa de sucção, manga do veio, anel de óleo, vedação mecânica, revestimento da bomba, filtro, revestimento do motor e acoplamento de descarga. Dependendo das condições de trabalho, a vida útil daquelas peças pode variar significativamente e pode ser mais reduzida do que o período legal da garantia.
A este propósito, atente aos nossos termos e condições gerais que também lhe enviamos por email, se solicitado.