The Project:


Industrial manufacture of gypsum fibreboard panels


Companies involved:

Lindner GFT GmbH

Grebner Reinigungssysteme (Cleaning Systems)


The Problem:


Pumping of residual water containing gypsum from the production process, with a solids content of 15-20%. The pumps are required to operate in "on-snore-mode", with fluctuating delivery volumes.


The Solution:


Use of one pump each of the types KTV2-50 and KTV2-80 with stirring systems (weight 24kg and 37kg in each case). These types are easy to clean and, with the aid of the stirring systems, can pump water containing solids without any problems. First maintenance was carried out after 16 months, and the oil was absolutely perfect. The only replacements made were the shaft protection sleeve, the shaft sealing ring and the rubber parts of the pump housing.

No caso de uma utilização abrasiva e corrosiva, certos componentes sofrerão um desgaste natural. No que respeita à aplicação anterior, o desgaste pode decorrer sobretudo no impulsor, agitador, placa de sucção, manga do veio, anel de óleo, vedação mecânica, revestimento da bomba, filtro, revestimento do motor e acoplamento de descarga. Dependendo das condições de trabalho, a vida útil daquelas peças pode variar significativamente e pode ser mais reduzida do que o período legal da garantia.
A este propósito, atente aos nossos termos e condições gerais que também lhe enviamos por email, se solicitado.