AZS ARGE Zugangsstollen, Linthal, Switzerland

The project:

Access shaft II -Kraftwerk Linth-Limmern AG "Project Linthal 2015"


Executing companies:

AZS ARGE Zugangsstollen

RL Pumpenanlagen GmbH, Wollerau


The problem:


Shafts with a pronounced tilt. drilling water and incoming water must be pumped out.


Our solution:


LH322W submersible pump is used, with a second pump held in reserve. The pump is frequency-controlled and regulated using a submersible pressure probe. If the water level rises, the speed is increased; when the water level falls, the speed is reduced. This type of control was chosen so that a very small pump container can be used which can be easily replaced after each new tunnel section. A model KTZ47.5 pump is built into the drainage water treatment.

W przypadku abrazyjnego i korozyjnego wykorzystania niektóre komponenty mogą naturalnie ulec większemu zużyciu. Jeśli chodzi o powyższe zastosowanie, zużyciu mogą ulec przede wszystkim wirnik, agitator, przyssawka, tuleja wału, pierścień ochronny, mechaniczna uszczelka, korpus pompy, sitko, obudowa silnika oraz połączenia odprowadzające. W zależności od warunków zastosowania czas działania tych części może się znacznie różnić i być krótszy niż okres gwarancji.
W tym zakresie prosimy o zapoznanie się z naszymi postanowieniami ogólnymi i warunkami, które również możemy na życzenie przesłać pocztą.