Direkt zum Inhalt | Direkt zur Navigation
U bevindt zich hier:

Rupp gravel plant, Dillingen, Germany

The project:


Preparation/clarification of rinse water from gravel processing


Executing company:

Josef Rupp GmbH&Co. KG


The problem:


The condensed slurry from the clarification tower is pumped into the buffer silos of the chamber filter press. The consistency of the medium ranges from fluid to a thickly flowing mud. Lime is added to the mud for conditioning.


Our solution:


The high proportion of abrasive sediments could not be pumped satisfactorily using the pumps in use until now. The result was a high degree of wear and replacement part costs.

In het geval van schurend en corrosief gebruik, zullen bepaalde componenten van nature sneller verslijten. Met betrekking tot bovenstaande toepassing kan slijtage met name optreden in de waaier, de roerder, het zuigdeksel, de asbus, de oliering, de mechanische asafdichting,het pomphuis, de zuigkorf, de motorbehuizing en de afvoerkoppeling. Afhankelijk van de werkingsomstandigheden kan de levensduur van die onderdelen aanzienlijk variëren en kan deze korter zijn dan de wettelijke garantieperiode.
Gelieve in dit verband rekening te houden met onze algemene voorwaarden, die we u op aanvraag kunnen toesturen.