The Project:


Construction of a waste-water channel in Belgrade with 1500mm diameter


Executing companies:

Ferbild d.o.o., Belgrade

Vedir-Impex d.o.o.


The problem:


Laying of pipes with 1500mm diameter at a depth of 8m. Proximity to the Danube means that groundwater occurs at only 3m depth. Accordingly, the construction site was 5m below the groundwater level along its entire length. Since the ground contains a high proportion of grit, difficulties were encountered in lowering the groundwater.


The solution:


12 wells sunk to depths of up to 25m were drilled parallel to the new canal. At this depth the ground consists of shingle and groundwater could be pumped with ease. 15 Tsurumi pumps were used, of types KTZ611,KTZ35.5, KTZ22.2, KTVE35.5 and LH615.

In het geval van schurend en corrosief gebruik, zullen bepaalde componenten van nature sneller verslijten. Met betrekking tot bovenstaande toepassing kan slijtage met name optreden in de waaier, de roerder, het zuigdeksel, de asbus, de oliering, de mechanische asafdichting,het pomphuis, de zuigkorf, de motorbehuizing en de afvoerkoppeling. Afhankelijk van de werkingsomstandigheden kan de levensduur van die onderdelen aanzienlijk variëren en kan deze korter zijn dan de wettelijke garantieperiode.
Gelieve in dit verband rekening te houden met onze algemene voorwaarden, die we u op aanvraag kunnen toesturen.