Statentunnel, Netherlands

The Project:


Expansion of the Erasmus railway line between Rotterdam and The Hague.


Executing company:

Ed. Züblin AG

DuraVermeer Groep NVn


The problem:


Using a hydroshield, two 2.3km tunnels with diameter 6.78m will be constructed.During building works the lowering of the groundwater level must be assured.


The solution:


Multiple submersible pumps from the KTV and KTZ series. The special characteristics of Tsurumi pumps, such as an internal mechanical seal, upstream shaft sleeve with gasket and a patented oil lifter allow them to be used in on-snore-mode over an extended period.

In het geval van schurend en corrosief gebruik, zullen bepaalde componenten van nature sneller verslijten. Met betrekking tot bovenstaande toepassing kan slijtage met name optreden in de waaier, de roerder, het zuigdeksel, de asbus, de oliering, de mechanische asafdichting,het pomphuis, de zuigkorf, de motorbehuizing en de afvoerkoppeling. Afhankelijk van de werkingsomstandigheden kan de levensduur van die onderdelen aanzienlijk variëren en kan deze korter zijn dan de wettelijke garantieperiode.
Gelieve in dit verband rekening te houden met onze algemene voorwaarden, die we u op aanvraag kunnen toesturen.