Direkt zum Inhalt | Direkt zur Navigation
U bevindt zich hier:

Renovation of underground parking garage, Munchich, Germany

The project:


Renovation of an underground parking garage built in 1971 in downtown Munich


Executing company:

Hangsicherung u. Sanierungs GmbH&Co.KG


The problem:


Renovation of an area of 4000m2, construction time 12 months. Removal of concrete surface with high-pressure equipment at up to 3000 bar water pressure. Draining water jets (up to 240 liters/min) with a high mud load must be pumped away.


Our solution:


The incoming muddy water is pumped out with a total of ten model LCS1.4S pumps. These are abrasion-resistant residual water pumps, which pump out the water down to a height of 1mm. The built in check valve allows continuous suction operation; no personnel is needed to monitor the pump operation.

In het geval van schurend en corrosief gebruik, zullen bepaalde componenten van nature sneller verslijten. Met betrekking tot bovenstaande toepassing kan slijtage met name optreden in de waaier, de roerder, het zuigdeksel, de asbus, de oliering, de mechanische asafdichting,het pomphuis, de zuigkorf, de motorbehuizing en de afvoerkoppeling. Afhankelijk van de werkingsomstandigheden kan de levensduur van die onderdelen aanzienlijk variëren en kan deze korter zijn dan de wettelijke garantieperiode.
Gelieve in dit verband rekening te houden met onze algemene voorwaarden, die we u op aanvraag kunnen toesturen.