Intermediate access gallery, Stelzen, Germany

The project:


Construction of the Stelzen intermediate access gallery during the building of the Blessberg railway tunnel.


Executing company:

Alfred Kunz Untertagebau GmbH


The problem:


Tunnel drainage under difficult conditions: long adits with a minimum of available space.


The solution:


Type KTZ35.5 pumps were installed in the pipeline as booster pumps. This special solution can be easily implemented with any of our standard contractors' pumps.

Thanks to the simple construction and the patented oil lifter, Tsurumi contractors' pumps can run dry absolutely trouble-free. The minimal cooling due to the flowing medium is sufficient.

In het geval van schurend en corrosief gebruik, zullen bepaalde componenten van nature sneller verslijten. Met betrekking tot bovenstaande toepassing kan slijtage met name optreden in de waaier, de roerder, het zuigdeksel, de asbus, de oliering, de mechanische asafdichting,het pomphuis, de zuigkorf, de motorbehuizing en de afvoerkoppeling. Afhankelijk van de werkingsomstandigheden kan de levensduur van die onderdelen aanzienlijk variëren en kan deze korter zijn dan de wettelijke garantieperiode.