Gotthard Basistunnel, Switzerland

The project:


Railway Tunnel Alptransit Gotthard,

Sedrun Section


Executing companies:

ARGE Transco Sedrun

Batigroup AG Tunnelbau,

Frutiger AG

Impresa Pizzarotti & C.S.p.


The "Sedrun Section" of the Gotthard Basistunnel encompasses two tunnels that are each 6,2 kilometres long and supplied through a 800m deep mine shaft. Two tunnels are at the base of the shaft and each breaks through to the north and south in the conventional manner.

The project tunnels through the unstable rock of the Tavetscher Zwischenmassiv with an up to 2.000m overlay. One of the two multifunctional sections of the 57 km long Gotthardbasis Tunnel is also being built in the Sedrun section.


The problem:


Pumping off the abrasive water that collects during the tunnelling excavations.


Our solution:


Use of the current 80+ Tsurumi wastewater submersible pumps for complete drainage. Pump series used: KTZ, KRS, KTV, LH, KRS with agitator.

In het geval van schurend en corrosief gebruik, zullen bepaalde componenten van nature sneller verslijten. Met betrekking tot bovenstaande toepassing kan slijtage met name optreden in de waaier, de roerder, het zuigdeksel, de asbus, de oliering, de mechanische asafdichting,het pomphuis, de zuigkorf, de motorbehuizing en de afvoerkoppeling. Afhankelijk van de werkingsomstandigheden kan de levensduur van die onderdelen aanzienlijk variëren en kan deze korter zijn dan de wettelijke garantieperiode.