Construction of a new culvert, Kleuterbach, Germany

The Project:


Replacement construction of the Kleuterbach culvert


Executing companies:

Johann Bunte GmbH&Co. KG

Bad Bentheim branch


The problem:


At km 42.431 N the Dortmund-Ems Canal passes over the upper Kleuterbach culvert. The planned channel widening of the Lüdinghausen–Senden section requires that the existing culvert be replaced. This will be built using the immersed-tube-method throughout its length. Submersible pumps will be necessary for floatingthe steel pipe culverts into place and sinking them.


The solution:


Pumps of types KTZ47.5 and KRS2-69 were used to control the flooding of the steel pipes and to sink them accurately.

In het geval van schurend en corrosief gebruik, zullen bepaalde componenten van nature sneller verslijten. Met betrekking tot bovenstaande toepassing kan slijtage met name optreden in de waaier, de roerder, het zuigdeksel, de asbus, de oliering, de mechanische asafdichting,het pomphuis, de zuigkorf, de motorbehuizing en de afvoerkoppeling. Afhankelijk van de werkingsomstandigheden kan de levensduur van die onderdelen aanzienlijk variëren en kan deze korter zijn dan de wettelijke garantieperiode.
Gelieve in dit verband rekening te houden met onze algemene voorwaarden, die we u op aanvraag kunnen toesturen.