Direkt zum Inhalt | Direkt zur Navigation
U bevindt zich hier:

Buchrain Tunnel Consortium, Switzerland

The project:


Construction of a road tunnel as part of the Rontal motorway feeder road


Executing companies:

ARGE Tunnel Buchrain

RL Pumpenanlagen GmbH, Bilten


The problem:


Provision of treated non-drinking water for the entire site; water intake from a nearby stream.


Our solution:


A KTZ33.7 pump is used to pump the untreated water out of the stream through a cyclone filter and into the water reservoir. The cyclone filter is used to separate off solids. The non-drinking water is supplied to the site via a pressure booster system.

In het geval van schurend en corrosief gebruik, zullen bepaalde componenten van nature sneller verslijten. Met betrekking tot bovenstaande toepassing kan slijtage met name optreden in de waaier, de roerder, het zuigdeksel, de asbus, de oliering, de mechanische asafdichting,het pomphuis, de zuigkorf, de motorbehuizing en de afvoerkoppeling. Afhankelijk van de werkingsomstandigheden kan de levensduur van die onderdelen aanzienlijk variëren en kan deze korter zijn dan de wettelijke garantieperiode.
Gelieve in dit verband rekening te houden met onze algemene voorwaarden, die we u op aanvraag kunnen toesturen.