Direkt zum Inhalt | Direkt zur Navigation
U bevindt zich hier:

Marmaray Undersea Tunnel, Turkey

The project:


Construction of a railway tunnel under the Bosporus


Executing company:

Taisei Corporation, Japan


The problem:


Construction of a multi-track rail tunnel under the ocean floor to join the two continents. Dewatering the site and keeping it dry during the construction period.


Our solution:


To dewater the site, 14 KTZ pumps and 16 LB pumps were employed in constant use. Due to their robust cast iron design, KTZ pumps are particularly suited for use on tunnel construction sites. The LB pumps are light, single-phase pumps for emergency use.

In het geval van schurend en corrosief gebruik, zullen bepaalde componenten van nature sneller verslijten. Met betrekking tot bovenstaande toepassing kan slijtage met name optreden in de waaier, de roerder, het zuigdeksel, de asbus, de oliering, de mechanische asafdichting,het pomphuis, de zuigkorf, de motorbehuizing en de afvoerkoppeling. Afhankelijk van de werkingsomstandigheden kan de levensduur van die onderdelen aanzienlijk variëren en kan deze korter zijn dan de wettelijke garantieperiode.
Gelieve in dit verband rekening te houden met onze algemene voorwaarden, die we u op aanvraag kunnen toesturen.