Dillig-Zaubzer Gravel Works, Dorfkemmatthen, Germany
The project:
Extraction of fine sand from gravel works
Executing company:
Company Dillig-Zaubzer, Dorfkemmatthen
The problem:
Extraction of fine sand from a gravel works using a pumps as an alternative to an excavator system.
Our solution:
A GPN3-100 with quick coupling was fitted to an excavator. Pumping of medium with a water content of 60-70% allows fine grains of sand to be flushed out. Once the pumped mass has settled, all that is needed is for the and to be sent through a screening plant. A cost-effective alternative for medium-sized sand and gravel pits.
In het geval van schurend en corrosief gebruik, zullen bepaalde componenten van nature sneller verslijten. Met betrekking tot bovenstaande toepassing kan slijtage met name optreden in de waaier, de roerder, het zuigdeksel, de asbus, de oliering, de mechanische asafdichting,het pomphuis, de zuigkorf, de motorbehuizing en de afvoerkoppeling. Afhankelijk van de werkingsomstandigheden kan de levensduur van die onderdelen aanzienlijk variëren en kan deze korter zijn dan de wettelijke garantieperiode.
Gelieve in dit verband rekening te houden met onze
algemene voorwaarden, die we u op aanvraag kunnen toesturen.