Direkt zum Inhalt | Direkt zur Navigation
U bevindt zich hier:

Lindner-Werke, Dettelbach, Germany

The Project:


Industrial manufacture of gypsum fibreboard panels


Companies involved:

Lindner GFT GmbH

Grebner Reinigungssysteme (Cleaning Systems)


The Problem:


Pumping of residual water containing gypsum from the production process, with a solids content of 15-20%. The pumps are required to operate in "on-snore-mode", with fluctuating delivery volumes.


The Solution:


Use of one pump each of the types KTV2-50 and KTV2-80 with stirring systems (weight 24kg and 37kg in each case). These types are easy to clean and, with the aid of the stirring systems, can pump water containing solids without any problems. First maintenance was carried out after 16 months, and the oil was absolutely perfect. The only replacements made were the shaft protection sleeve, the shaft sealing ring and the rubber parts of the pump housing.

In het geval van schurend en corrosief gebruik, zullen bepaalde componenten van nature sneller verslijten. Met betrekking tot bovenstaande toepassing kan slijtage met name optreden in de waaier, de roerder, het zuigdeksel, de asbus, de oliering, de mechanische asafdichting,het pomphuis, de zuigkorf, de motorbehuizing en de afvoerkoppeling. Afhankelijk van de werkingsomstandigheden kan de levensduur van die onderdelen aanzienlijk variëren en kan deze korter zijn dan de wettelijke garantieperiode.
Gelieve in dit verband rekening te houden met onze algemene voorwaarden, die we u op aanvraag kunnen toesturen.