NEAT Amsteg and Erstfeld construction sites, Switzerland

The project:


New Transalpine Railway (NEAT), Amsteg and Erstfeld construction sites


Executing company:

RL Pumpenanlagen GmbH, Wollerau


The problem:


Incoming contaminated drainage water from the tunnels are guided to the collection basin of the sand press. This was initially done with standard commercial construction pumps, but the impellers were worn out after a very short time.


Our solution:


Four GPN3-80 Tsurumi mud pumps with agitator were used. This 4-pole jacket-cooled pump is designed for use in the harshest of mud environments, so that the impeller, agitators, and suction plates are fabricated of custom-coated chromium cast iron with a Brinell hardness of 415 to 425. After 6 months of use, almost no wear could be detected.

In het geval van schurend en corrosief gebruik, zullen bepaalde componenten van nature sneller verslijten. Met betrekking tot bovenstaande toepassing kan slijtage met name optreden in de waaier, de roerder, het zuigdeksel, de asbus, de oliering, de mechanische asafdichting,het pomphuis, de zuigkorf, de motorbehuizing en de afvoerkoppeling. Afhankelijk van de werkingsomstandigheden kan de levensduur van die onderdelen aanzienlijk variëren en kan deze korter zijn dan de wettelijke garantieperiode.
Gelieve in dit verband rekening te houden met onze algemene voorwaarden, die we u op aanvraag kunnen toesturen.