Direkt zum Inhalt | Direkt zur Navigation
U bevindt zich hier:

Central Market, Hamburg, Germany

The project:

Fruit and vegetable hall of the Central Market in Hamburg;

Renewal of the access ramps


Company carrying out the works:

Eurovia Vinci, Building Renovation Department,

Branch offices in Hamburg and Wallau-Hofheim


Tsurumi supervisor:

Mr. Andreas Rössig (Field Sales Team North)


The problem:

Pump transfer of a concrete and water mixture for the renovation of the ramps, with a solids content of 15 - 20%. The mixture must be pumped from the basement of the Central Market hall into various transport containers.


The solution:

Deployment of 4, KTZE21.5-51 pumps with an electrode control system. The KTZ pumps from Tsurumi are massive wastewater pumps made of cast iron. The quantity that had to be pumped amounted to approx. 60 - 80 cubic meters. Our pumps can handle this kind of problem without any breakdowns.

In het geval van schurend en corrosief gebruik, zullen bepaalde componenten van nature sneller verslijten. Met betrekking tot bovenstaande toepassing kan slijtage met name optreden in de waaier, de roerder, het zuigdeksel, de asbus, de oliering, de mechanische asafdichting,het pomphuis, de zuigkorf, de motorbehuizing en de afvoerkoppeling. Afhankelijk van de werkingsomstandigheden kan de levensduur van die onderdelen aanzienlijk variëren en kan deze korter zijn dan de wettelijke garantieperiode.
Gelieve in dit verband rekening te houden met onze algemene voorwaarden, die we u op aanvraag kunnen toesturen.