Extension of connection road L639 in Gelsenkirchen
The Project:
Extension of the connection road L639,
Florastraße Gelsenkirchen
Executing company:
Heitkamp Erd- und Straßenbau GmbH
The Problem:
Repumping a mixed water channel because a shaft had to be installed.
Our Solution:
Two Tsurumi KRS822 pumped off the dammed water. 720 m³/h were re-passed into the mixed water channel at a distance of 100 m.
This took 3 weeks where the pumps were in service 24 h a day without any failure.
The pumps were laid into the bed of the channel without further installation. No problem for Tsurumi pumps.
In het geval van schurend en corrosief gebruik, zullen bepaalde componenten van nature sneller verslijten. Met betrekking tot bovenstaande toepassing kan slijtage met name optreden in de waaier, de roerder, het zuigdeksel, de asbus, de oliering, de mechanische asafdichting,het pomphuis, de zuigkorf, de motorbehuizing en de afvoerkoppeling. Afhankelijk van de werkingsomstandigheden kan de levensduur van die onderdelen aanzienlijk variëren en kan deze korter zijn dan de wettelijke garantieperiode.
Gelieve in dit verband rekening te houden met onze
algemene voorwaarden, die we u op aanvraag kunnen toesturen.