Groundwater tanks on B23 Saulgrub, Germany

The project:

City bypass for federal road B23 - 450m groundwater tank through the Saulgrub upland moor between Saulgrub and Unterammergau.


Executing company:

HOCHTIEF Infrastructure GmbH, Southeast Germany branch


Tsurumi consultants:

Mr. Christian Kulik (External sales force Bavaria)


The problem:

During implementation of the Saulgrub bypass, a 450m seciond of federal road B23 had to be taken through an underpass under the Murnau-Oberammergau railway. The area is permanently underwater, and ground and strata water also entered. Water retention using well pumps is essential.


The solution:

Open water retention using small, single-phase model HS2.75S wastewater pumps, controlled by float switches. Three-phase model KTV2-15 and KTV2-22 wastewater pumps run in 24-hour sip operation.

In caso di utilizzo di prodotti abrasivi o corrosivi, alcuni componenti saranno naturalmente soggetti a maggiore usura. Riguardo alla suddetta applicazione, l'usura può avvenire principalmente nella girante, nell'agitatore, nella piastra aspirante, nel manicotto dell'albero, nell'anello di lubrificazione, nella tenuta meccanica, nel corpo della pompa, nel filtro, nel corpo del motore e nel raccordo di scarico. A seconda delle condizioni di lavoro, la durata di queste parti può variare significativamente ed essere inferiore al periodo legale di garanzia.