Schwäbisch Gmünd Tunnel, Germany

The project:


Construction of a two-lane tunnel with escape galleries to provide a direct route through the town of Schwäbisch Gmünd without the inconvenience of traffic lights at crossings, etc.


Executing companies:

  • Company Baresel
  • Company Hinteregger+Söhne Bauges. mbH
  • Company Züblin
  • Company Ostu-Stettin

The problem:


Tunnel advance using tunnel boring methods; advance on a downhill gradient at some points; incursion of ground and fissure water to be expected; tunnel bore to pass under the River Rems. High mud content due to soluble mudstone, high risk of abrasion due to quartz content of the sandstone.


Our solution:


Approximately 30 KTZ and KTV pumps with motor ratings up to 7.5 kW are being employed. These pumps are sturdy, requiring little maintenance; if any additional ones are required these can be supplied immediately on call-off at any time.

In caso di utilizzo di prodotti abrasivi o corrosivi, alcuni componenti saranno naturalmente soggetti a maggiore usura. Riguardo alla suddetta applicazione, l'usura può avvenire principalmente nella girante, nell'agitatore, nella piastra aspirante, nel manicotto dell'albero, nell'anello di lubrificazione, nella tenuta meccanica, nel corpo della pompa, nel filtro, nel corpo del motore e nel raccordo di scarico. A seconda delle condizioni di lavoro, la durata di queste parti può variare significativamente ed essere inferiore al periodo legale di garanzia.