The Project:
Construction of the road tunnel B236n in Dortmund-Berghofen
Executing company: Bilfinger Berger AG
The Problem:
Open dewatering during the underground tunnel heading and also cut-and-cover work with the aid of submersible pumps.
Our Solution:
Pumps of types KTZ32.2, KTZ45.5 and KTV22.2 were used. Continuous snore mode and the possibility of dry running are possible with Tsurumi pumps and secure driving at this construction site.