Reitersberg Tunnel, Germany

The Project:

Reitersberg Tunnel of the Ebensfeld–Erfurt ICE rail link


Contractor:

Alfred Kunz Untertagebau

Swietelsky Tunnelbau

Leonhard Weiss


Tsurumi support:

Christian Kulik (Field Sales)


The Problem:

The 2975 m long tunnel is being cut using mining methods. After the snow melted, the water incidence in the tunnel suddenly rose to a maximum of 20 litres/second. The medium was made highly abrasive by its slurried stone content.


The Solution:

Massive drainage pump of types KTZ411 and KTZ611 (11kW) transport water over a distance of 500m to 1000m. The KTZ series is the perfect contractors' pump due to its good performance. The replacement of wearing parts is very simple. After training by qualified Tsurumi staff, all maintenance can be done independently on site.


In caso di utilizzo di prodotti abrasivi o corrosivi, alcuni componenti saranno naturalmente soggetti a maggiore usura. Riguardo alla suddetta applicazione, l'usura può avvenire principalmente nella girante, nell'agitatore, nella piastra aspirante, nel manicotto dell'albero, nell'anello di lubrificazione, nella tenuta meccanica, nel corpo della pompa, nel filtro, nel corpo del motore e nel raccordo di scarico. A seconda delle condizioni di lavoro, la durata di queste parti può variare significativamente ed essere inferiore al periodo legale di garanzia.
A questo proposito, si prega di prestare attenzione ai nostri termini e condizioni generali, che possiamo anche inviare per posta elettronica su richiesta.