Ingrid tunnel - Velbert, Germany

The Project:


Extension of the L433 road Velbert/Langenberg


Executing company:

Wayss & Freytag Ing. Bau AG


The Problem:


The ground water must be pumped off. Continuous truck traffic has to be ensured due to the traditional excavation by means of building machines, i.e. pollution by mud must be prevented by continuously pumping off in pumping on snore mode.


Our Solution:


Lowering the ground water table by means of contractors' pumps of the KTZ and KTV series. Our pumps are provided with a patented oil lifter which ensures lubrication and cooling of the mechanical seal even at a minimum oil level.

Twenty-four-hour pumping on snore mode without failure has been implemented for months now due to this particular feature.

In caso di utilizzo di prodotti abrasivi o corrosivi, alcuni componenti saranno naturalmente soggetti a maggiore usura. Riguardo alla suddetta applicazione, l'usura può avvenire principalmente nella girante, nell'agitatore, nella piastra aspirante, nel manicotto dell'albero, nell'anello di lubrificazione, nella tenuta meccanica, nel corpo della pompa, nel filtro, nel corpo del motore e nel raccordo di scarico. A seconda delle condizioni di lavoro, la durata di queste parti può variare significativamente ed essere inferiore al periodo legale di garanzia.
A questo proposito, si prega di prestare attenzione ai nostri termini e condizioni generali, che possiamo anche inviare per posta elettronica su richiesta.