Construction of a new culvert, Kleuterbach, Germany

The Project:


Replacement construction of the Kleuterbach culvert


Executing companies:

Johann Bunte GmbH&Co. KG

Bad Bentheim branch


The problem:


At km 42.431 N the Dortmund-Ems Canal passes over the upper Kleuterbach culvert. The planned channel widening of the Lüdinghausen–Senden section requires that the existing culvert be replaced. This will be built using the immersed-tube-method throughout its length. Submersible pumps will be necessary for floatingthe steel pipe culverts into place and sinking them.


The solution:


Pumps of types KTZ47.5 and KRS2-69 were used to control the flooding of the steel pipes and to sink them accurately.

In caso di utilizzo di prodotti abrasivi o corrosivi, alcuni componenti saranno naturalmente soggetti a maggiore usura. Riguardo alla suddetta applicazione, l'usura può avvenire principalmente nella girante, nell'agitatore, nella piastra aspirante, nel manicotto dell'albero, nell'anello di lubrificazione, nella tenuta meccanica, nel corpo della pompa, nel filtro, nel corpo del motore e nel raccordo di scarico. A seconda delle condizioni di lavoro, la durata di queste parti può variare significativamente ed essere inferiore al periodo legale di garanzia.
A questo proposito, si prega di prestare attenzione ai nostri termini e condizioni generali, che possiamo anche inviare per posta elettronica su richiesta.