ARGE tunnel Achrain, Austria

The Project:


Construction of a 3,200 m long road tunnel


Executing companies:

ARGE Tunnel Achrain/Österreich

Beton- u. Monierbau Gesellschaft m.b.H.

Alpine Mayreder Bau GmbH

Jäger Bau GmbH


The Problem:


Drainage during the complete tunnel heading work.


Our Solution:


Use of type KTZ32.2 submersible pumps. These are operated in 24-hour snore mode.

Thanks to their special properties including their internal rotating mechanical seal and upstream shaft protection sleeve with seal, the Tsurumi pumps can be operated in 24-hour snore mode.


The advantages of this design are:

  • Extended service lives
  • Lower costs for spare parts
  • Lower labour costs
In caso di utilizzo di prodotti abrasivi o corrosivi, alcuni componenti saranno naturalmente soggetti a maggiore usura. Riguardo alla suddetta applicazione, l'usura può avvenire principalmente nella girante, nell'agitatore, nella piastra aspirante, nel manicotto dell'albero, nell'anello di lubrificazione, nella tenuta meccanica, nel corpo della pompa, nel filtro, nel corpo del motore e nel raccordo di scarico. A seconda delle condizioni di lavoro, la durata di queste parti può variare significativamente ed essere inferiore al periodo legale di garanzia.