Tunnel Siegkreisel, Betzdorf

The Project:


Construction of a 360 m long tunnel with three lanes as component of a municipal bypass system; completion: Spring, 2006.


Executing company:

ARGE Tunnel Tunnel Siegkreisel, Betzdorf

Hochtief Construction AG

Kirchner Bau GmbH

Alpine Bau Deutschland GmbH


The Problem:


Pumping off of the water arising during the underground tunnel heading.


Our Solution:


Use of submersible pumps of type KTZ32.2, these being operated in permanent snore mode (dry running) during the complete construction period. This application is no problem for the pump thanks to the patented oil distributor in combination with the rotating mechanical seal, which is located completely internally.

In caso di utilizzo con liquidi abrasivi o corrosivi, alcuni componenti saranno naturalmente soggetti a maggiore usura. Nello specifico l'usura può avvenire principalmente nella girante, nell'agitatore, nel piatto di usura, nel manicotto dell'albero, nell'anello di lubrificazione, nel dispositivo di tenuta, nel corpo della pompa, nel filtro, nel corpo del motore e nel raccordo di scarico. A seconda delle condizioni di lavoro, la durata di queste parti può variare significativamente ed essere inferiore al periodo legale di garanzia.
Si prega di vedere in merito le nostre condizioni generali, che possiamo inviarvi per posta elettronica su richiesta.