ICE railway track Airport Cologne-Bonn

The project:


Underground railway track for linking Cologne-Bonn airport


Executing companies:

Consortium Flughafenanbindung

Köln/Bonn Los3

E. Heitkamp GmbH

Wayss & Freytag Ingenieurbau GmbH

Bauer Spezialtiefbau GmbH

F.C. Trapp AG

Dewatering with 24-h pump duty by:

Smet GWT N.V., Dessel, Belgium

Biergans Pumpen-Vertrieb GmbH, Duisburg


The problem:


Pumping off the water arising during underground tunnel heading, lowering the ground water level over a large area.


Our solution:


Deep wells were built in the area in which submersible waste water pump were installed. This allowed to lower the ground-water table to the lowest possible level.

In caso di utilizzo con liquidi abrasivi o corrosivi, alcuni componenti saranno naturalmente soggetti a maggiore usura. Nello specifico l'usura può avvenire principalmente nella girante, nell'agitatore, nel piatto di usura, nel manicotto dell'albero, nell'anello di lubrificazione, nel dispositivo di tenuta, nel corpo della pompa, nel filtro, nel corpo del motore e nel raccordo di scarico. A seconda delle condizioni di lavoro, la durata di queste parti può variare significativamente ed essere inferiore al periodo legale di garanzia.