The Project:
Water drainage in a 12,000m3 pit
Fischer Weilheim Construction Company
Dealer Schmittinger Köngen
Companies involved with legal status and location
Task
Ground and rainwater drainage for a 12,000m3-large pit over 17 months. All incoming groundwater and rainwater must be disposed of.
KTZ-series pumps with control units are installed in collector shafts with electrode control – four KTZ 33.7. The shafts have a diameter of only 400 mm, so slim, space-saving pumps are required.
The solution:
The individual shafts are equipped with 16 pumps of the LB series with electrode control type LB 480 with electrode