Tunnel Siegkreisel, Betzdorf

The Project:


Construction of a 360 m long tunnel with three lanes as component of a municipal bypass system; completion: Spring, 2006.


Executing company:

ARGE Tunnel Tunnel Siegkreisel, Betzdorf

Hochtief Construction AG

Kirchner Bau GmbH

Alpine Bau Deutschland GmbH


The Problem:


Pumping off of the water arising during the underground tunnel heading.


Our Solution:


Use of submersible pumps of type KTZ32.2, these being operated in permanent snore mode (dry running) during the complete construction period. This application is no problem for the pump thanks to the inhouse developed oil distributor in combination with the rotating mechanical seal, which is located completely internally.

Amennyiben súroló és maró anyagokat használ, a szivattyú egyes alkatrészeinek kopása a természetesnél nagyobb fokú lesz. A fenti használat esetében az említett kopás főleg a lapátkerékben, a keverőben, a szívólemezen, a nyélburkolaton, az olajgyűrűn, a mechanikus záron, a szivattyú borításán, a szűrőn, a motorházon és a kimenő anyag csatlakozásánál tapasztalható. A fenti alkatrészek élettartalma a munkakörülményektől függően jelentősen megváltozhat, és akár a törvényben előírt jótállási időszaknál is rövidebb lehet.
Ennek tekintetében kérjük, vegye figyelembe az általános feltételeinket, amit kérésre szintén elküldünk Önnek e-mailben.