Reitersberg Tunnel, Germany

The Project:

Reitersberg Tunnel of the Ebensfeld–Erfurt ICE rail link


Contractor:

Alfred Kunz Untertagebau

Swietelsky Tunnelbau

Leonhard Weiss


Tsurumi support:

Christian Kulik (Field Sales)


The Problem:

The 2975 m long tunnel is being cut using mining methods. After the snow melted, the water incidence in the tunnel suddenly rose to a maximum of 20 litres/second. The medium was made highly abrasive by its slurried stone content.


The Solution:

Massive drainage pump of types KTZ411 and KTZ611 (11kW) transport water over a distance of 500m to 1000m. The KTZ series is the perfect contractors' pump due to its good performance. The replacement of wearing parts is very simple. After training by qualified Tsurumi staff, all maintenance can be done independently on site.


Amennyiben súroló és maró anyagokat használ, a szivattyú egyes alkatrészeinek kopása a természetesnél nagyobb fokú lesz. A fenti használat esetében az említett kopás főleg a lapátkerékben, a keverőben, a szívólemezen, a nyélburkolaton, az olajgyűrűn, a mechanikus záron, a szivattyú borításán, a szűrőn, a motorházon és a kimenő anyag csatlakozásánál tapasztalható. A fenti alkatrészek élettartalma a munkakörülményektől függően jelentősen megváltozhat, és akár a törvényben előírt jótállási időszaknál is rövidebb lehet.
Ennek tekintetében kérjük, vegye figyelembe az általános feltételeinket, amit kérésre szintén elküldünk Önnek e-mailben.