Intermediate access gallery, Stelzen, Germany

The project:


Construction of the Stelzen intermediate access gallery during the building of the Blessberg railway tunnel.


Executing company:

Alfred Kunz Untertagebau GmbH


The problem:


Tunnel drainage under difficult conditions: long adits with a minimum of available space.


The solution:


Type KTZ35.5 pumps were installed in the pipeline as booster pumps. This special solution can be easily implemented with any of our standard contractors' pumps.

Thanks to the simple construction and the inhouse developed oil lifter, Tsurumi contractors' pumps can run dry absolutely trouble-free. The minimal cooling due to the flowing medium is sufficient.

Amennyiben súroló és maró anyagokat használ, a szivattyú egyes alkatrészeinek kopása a természetesnél nagyobb fokú lesz. A fenti használat esetében az említett kopás főleg a lapátkerékben, a keverőben, a szívólemezen, a nyélburkolaton, az olajgyűrűn, a mechanikus záron, a szivattyú borításán, a szűrőn, a motorházon és a kimenő anyag csatlakozásánál tapasztalható. A fenti alkatrészek élettartalma a munkakörülményektől függően jelentősen megváltozhat, és akár a törvényben előírt jótállási időszaknál is rövidebb lehet.