The project:


Underground railway track for linking Cologne-Bonn airport


Executing companies:

Consortium Flughafenanbindung

Köln/Bonn Los3

E. Heitkamp GmbH

Wayss & Freytag Ingenieurbau GmbH

Bauer Spezialtiefbau GmbH

F.C. Trapp AG

Dewatering with 24-h pump duty by:

Smet GWT N.V., Dessel, Belgium

Biergans Pumpen-Vertrieb GmbH, Duisburg


The problem:


Pumping off the water arising during underground tunnel heading, lowering the ground water level over a large area.


Our solution:


Deep wells were built in the area in which submersible waste water pump were installed. This allowed to lower the ground-water table to the lowest possible level.

Tunel entrance Hermann-Lönsstraße, 1st section of excavation.
Amennyiben súroló és maró anyagokat használ, a szivattyú egyes alkatrészeinek kopása a természetesnél nagyobb fokú lesz. A fenti használat esetében az említett kopás főleg a lapátkerékben, a keverőben, a szívólemezen, a nyélburkolaton, az olajgyűrűn, a mechanikus záron, a szivattyú borításán, a szűrőn, a motorházon és a kimenő anyag csatlakozásánál tapasztalható. A fenti alkatrészek élettartalma a munkakörülményektől függően jelentősen megváltozhat, és akár a törvényben előírt jótállási időszaknál is rövidebb lehet.
Ennek tekintetében kérjük, vegye figyelembe az általános feltételeinket, amit kérésre szintén elküldünk Önnek e-mailben.