The project:


Construction of a two-lane tunnel with escape galleries to provide a direct route through the town of Schwäbisch Gmünd without the inconvenience of traffic lights at crossings, etc.


Executing companies:

  • Company Baresel
  • Company Hinteregger+Söhne Bauges. mbH
  • Company Züblin
  • Company Ostu-Stettin

The problem:


Tunnel advance using tunnel boring methods; advance on a downhill gradient at some points; incursion of ground and fissure water to be expected; tunnel bore to pass under the River Rems. High mud content due to soluble mudstone, high risk of abrasion due to quartz content of the sandstone.


Our solution:


Approximately 30 KTZ and KTV pumps with motor ratings up to 7.5 kW are being employed. These pumps are sturdy, requiring little maintenance; if any additional ones are required these can be supplied immediately on call-off at any time.

U slučaju abrazivnih i korozivnih primjena, normalno je da će se u određenim komponentama dogoditi snažnije trošenje. S obzirom na gornju primjenu trošenje se može odvijati uglavnom u radnom kolu, miješalici, usisnoj ploči, rukavcu osovine, uljnom prstenu, mehaničkoj brtvi, kućištu pumpe, cjedilu, kućištu motora i ispusnoj spojki. Ovisno o radnim uvjetima vijek trajanja tih dijelova može značajno varirati i može biti kraći od pravnog zakonskog razdoblja.