Höllberg A38 tunnel, Thüringen, Germany

The project:


Traffic project German Unity No. 13 A38 Breitenworbis-Bleicherode segment Construction of the Höllberg tunnel


Execution company:

Baresel GmbH


The problem:


Drainage via open dewatering during tunnelling operations.


Our solution:


Multiple submersible pumps from the KTV and KTZ series were used. The special characteristics of Tsurumi pumps, such as an inside mechanical seal, shaft sleeve with oil ring and an oil lifter allow them to be used in 24-hour suction operation.

U slučaju abrazivnih i korozivnih primjena, normalno je da će se u određenim komponentama dogoditi snažnije trošenje. S obzirom na gornju primjenu trošenje se može odvijati uglavnom u radnom kolu, miješalici, usisnoj ploči, rukavcu osovine, uljnom prstenu, mehaničkoj brtvi, kućištu pumpe, cjedilu, kućištu motora i ispusnoj spojki. Ovisno o radnim uvjetima vijek trajanja tih dijelova može značajno varirati i može biti kraći od pravnog zakonskog razdoblja.
S obzirom na to pridavajte pažnju našim općim uvjetima koje vam također šaljemo e-poštom na zahtjev.