Extension of connection road L639 in Gelsenkirchen

The Project:


Extension of the connection road L639,

Florastraße Gelsenkirchen

Executing company:

Heitkamp Erd- und Straßenbau GmbH


The Problem:


Repumping a mixed water channel because a shaft had to be installed.


Our Solution:


Two Tsurumi KRS822 pumped off the dammed water. 720 m³/h were re-passed into the mixed water channel at a distance of 100 m.


This took 3 weeks where the pumps were in service 24 h a day without any failure.


The pumps were laid into the bed of the channel without further installation. No problem for Tsurumi pumps.

U slučaju abrazivnih i korozivnih primjena, normalno je da će se u određenim komponentama dogoditi snažnije trošenje. S obzirom na gornju primjenu trošenje se može odvijati uglavnom u radnom kolu, miješalici, usisnoj ploči, rukavcu osovine, uljnom prstenu, mehaničkoj brtvi, kućištu pumpe, cjedilu, kućištu motora i ispusnoj spojki. Ovisno o radnim uvjetima vijek trajanja tih dijelova može značajno varirati i može biti kraći od pravnog zakonskog razdoblja.