Caisson tunnel, Oslo, Norway

The project:


Construction of a tunnel using caissons


Executing companies:

Skanska AS

Intec Pumper AS


The problem:


During construction of a tunnel with caissons, the individual elements had to be emptied after positioning. In addition, water flowing in along the segment had to be pumped out.


Our solution:


To pump larger quantities of water, pumps from the KTV series were used. Along the segment, model LSC pumps were installed. These flat suction pumps remove water above a residual level of 1mm, allowing work to proceed in as dry an environment as possible.

U slučaju abrazivnih i korozivnih primjena, normalno je da će se u određenim komponentama dogoditi snažnije trošenje. S obzirom na gornju primjenu trošenje se može odvijati uglavnom u radnom kolu, miješalici, usisnoj ploči, rukavcu osovine, uljnom prstenu, mehaničkoj brtvi, kućištu pumpe, cjedilu, kućištu motora i ispusnoj spojki. Ovisno o radnim uvjetima vijek trajanja tih dijelova može značajno varirati i može biti kraći od pravnog zakonskog razdoblja.
S obzirom na to pridavajte pažnju našim općim uvjetima koje vam također šaljemo e-poštom na zahtjev.