Direkt zum Inhalt | Direkt zur Navigation
Vi ste ovdje:

Buchrain Tunnel Consortium, Switzerland

The project:


Construction of a road tunnel as part of the Rontal motorway feeder road


Executing companies:

ARGE Tunnel Buchrain

RL Pumpenanlagen GmbH, Bilten


The problem:


Provision of treated non-drinking water for the entire site; water intake from a nearby stream.


Our solution:


A KTZ33.7 pump is used to pump the untreated water out of the stream through a cyclone filter and into the water reservoir. The cyclone filter is used to separate off solids. The non-drinking water is supplied to the site via a pressure booster system.

U slučaju abrazivnih i korozivnih primjena, normalno je da će se u određenim komponentama dogoditi snažnije trošenje. S obzirom na gornju primjenu trošenje se može odvijati uglavnom u radnom kolu, miješalici, usisnoj ploči, rukavcu osovine, uljnom prstenu, mehaničkoj brtvi, kućištu pumpe, cjedilu, kućištu motora i ispusnoj spojki. Ovisno o radnim uvjetima vijek trajanja tih dijelova može značajno varirati i može biti kraći od pravnog zakonskog razdoblja.
S obzirom na to pridavajte pažnju našim općim uvjetima koje vam također šaljemo e-poštom na zahtjev.