ARGE tunnel Achrain, Austria

The Project:


Construction of a 3,200 m long road tunnel


Executing companies:

ARGE Tunnel Achrain/Österreich

Beton- u. Monierbau Gesellschaft m.b.H.

Alpine Mayreder Bau GmbH

Jäger Bau GmbH


The Problem:


Drainage during the complete tunnel heading work.


Our Solution:


Use of type KTZ32.2 submersible pumps. These are operated in 24-hour snore mode.

Thanks to their special properties including their internal rotating mechanical seal and upstream shaft protection sleeve with seal, the Tsurumi pumps can be operated in 24-hour snore mode.


The advantages of this design are:

  • Extended service lives
  • Lower costs for spare parts
  • Lower labour costs
U slučaju abrazivnih i korozivnih primjena, normalno je da će se u određenim komponentama dogoditi snažnije trošenje. S obzirom na gornju primjenu trošenje se može odvijati uglavnom u radnom kolu, miješalici, usisnoj ploči, rukavcu osovine, uljnom prstenu, mehaničkoj brtvi, kućištu pumpe, cjedilu, kućištu motora i ispusnoj spojki. Ovisno o radnim uvjetima vijek trajanja tih dijelova može značajno varirati i može biti kraći od pravnog zakonskog razdoblja.