Direkt zum Inhalt | Direkt zur Navigation
Vi ste ovdje:

Feldhofe mud dump site, Germany

The Project:


To treat the surface discharge water before it enters the receiving water course.


Executing company:

Firma PLA Pumpen und Anlagenbau GmbH

22844 Norderstedt


The problem:


The discharge water of the Feldhofe mud dumpsite is heavily laden with Fe-ions. Treatment of the surface discharge water is necessary before it enters the receiving watercourse.


The solution:


Treatment via oxidation and iron oxide precipitation, assisted by a 2.2kW submersible aerator. Since the bottom of the natural water body is uneven and muddy, a base plate was welded on and the aerator sunk using a crane. Oxygen measurements made after installation (using DO electrodes) were highly satisfactory.

U slučaju abrazivnih i korozivnih primjena, normalno je da će se u određenim komponentama dogoditi snažnije trošenje. S obzirom na gornju primjenu trošenje se može odvijati uglavnom u radnom kolu, miješalici, usisnoj ploči, rukavcu osovine, uljnom prstenu, mehaničkoj brtvi, kućištu pumpe, cjedilu, kućištu motora i ispusnoj spojki. Ovisno o radnim uvjetima vijek trajanja tih dijelova može značajno varirati i može biti kraći od pravnog zakonskog razdoblja.
S obzirom na to pridavajte pažnju našim općim uvjetima koje vam također šaljemo e-poštom na zahtjev.