Syphon construction under nature reserve Löcknitztal by microtunnelling

The project:


Pipe heading DN 1600 by micro-tunnelling with reinforced concrete driving pipes for passing under the nature reserve Löcknitztal near Kienbaum (Land Brandenburg) as protective pipe for a high-pressure gas pipeline DN 1100.

Client:

Ruhrgas AG/Verbundnetz Gas AG

Executing company:

Gildemeister Tief-, Stahlbeton- und

Rohrleitungsbau GmbH&Co. KG Berlin


The problem:


Pumping off the supporting liquid (bentonite suspension) used in the tunnel during pipe heading.


Our solution:


Application of a submersible pump Type KTZ35.5 connected with an accompanying pipe line DN 100 for continuous removal of the supporting liquid during the whole time of pipe heading.

The pump was always positioned at the lowest point of the syphon and operated on snore mode.

En cas d'utilisation abrasive et corrosive, une usure plus important se manifestera naturellement dans certains composants. En rapport avec l'application ci-dessus, l'usure peut principalement apparaître au niveau de la turbine, de l'agitateur, du panneau d'aspiration, de la chemise d'arbre, de la bague de graissage, du joint mécanique, du carter de la pompe, du filtre, du carter du moteur et du couple de décharge. Selon les conditions de travail, la durée de vie de ces pièces peut varier de manière significative et peut être inférieure à la période légale de garantie.