Dülmen micro-tunneling, Germany
The Project:
Dülmen canal construction - micro tunneling, Germany
Executing company:
Fa. Jordan Tiefbau GmbH & Co. KG
Kierdorfer Str. 65
D-50169 Kerpen
The Problem:
The soil loosened at the fron when heading is returned to the pressing pit and must be removed here and disposed.
Our Solution:
The viscous concentrated soil could be sucked off ba a KTZ pump with "suction hat" (reversed inlet strainer).
The specific advantage was the operation of the pump which could be used also during pressing. Transporting off was simple as it was possible to pump the drilling material directly into the containers provided.
No tank truck was necessary.
En cas d'utilisation abrasive et corrosive, une usure plus important se manifestera naturellement dans certains composants. En rapport avec l'application ci-dessus, l'usure peut principalement apparaître au niveau de la turbine, de l'agitateur, du panneau d'aspiration, de la chemise d'arbre, de la bague de graissage, du joint mécanique, du carter de la pompe, du filtre, du carter du moteur et du couple de décharge. Selon les conditions de travail, la durée de vie de ces pièces peut varier de manière significative et peut être inférieure à la période légale de garantie.
À cet égard, veuillez tenir compte de nos
conditions générales que nous pouvons également vous envoyer par e-mail si vous le souhaitez.