City railway tunnel, Dortmund

The project:


Construction of the city railway station Ostentor


Executing company:

Wayss & Freytag Ingenieurbau AG

Oevermann GmbH


The problem:


Pumping off the water arising during mined underground heading.


Our solution:


10 Tsurumi submersible waste water pumps of series KTZ were used for drainage. In the illustration above one KTZ45.5 and one KTZ67.5 are shown on snore operation installed in the starting shaft. The tunnel is driven on two levels over a length of 1300m and a cross section from 36sqm up to 185sqm. Track 3 at level 21m under ground passes below the track 2 running at level 14m underground and surfaces between the tunnels for tracks 1 and 2.

En cas d'utilisation abrasive et corrosive, une usure plus important se manifestera naturellement dans certains composants. En rapport avec l'application ci-dessus, l'usure peut principalement apparaître au niveau de la turbine, de l'agitateur, du panneau d'aspiration, de la chemise d'arbre, de la bague de graissage, du joint mécanique, du carter de la pompe, du filtre, du carter du moteur et du couple de décharge. Selon les conditions de travail, la durée de vie de ces pièces peut varier de manière significative et peut être inférieure à la période légale de garantie.
À cet égard, veuillez tenir compte de nos conditions générales que nous pouvons également vous envoyer par e-mail si vous le souhaitez.