Augustaburg tunnel, Erfurt

The Project:


Construction of a railway tunnel with a length of 1480 m.


Executing companies:

ARGE Tunnel Augustaburg, Erfurt

Hochtief Construction AG, Frankfurt

Alpine Bau Deutschland GmbH


The Problem:


Drainage during the underground tunnel heading.


Our Solution:


A Use of type KTZ32.2 submersible pumps operated in 24-hour snore mode for drainage purposes during the tunnel heading. Thanks to their special properties including their internal rotating mechanical seal and upstream shaft protection sleeve with seal, the Tsurumi pumps can be operated in 24-hour snore mode.


The advantages of this design are:

  • Extended service lives
  • Lower costs for spare parts
  • Lower labour costs
En cas d'utilisation abrasive et corrosive, une usure plus important se manifestera naturellement dans certains composants. En rapport avec l'application ci-dessus, l'usure peut principalement apparaître au niveau de la turbine, de l'agitateur, du panneau d'aspiration, de la chemise d'arbre, de la bague de graissage, du joint mécanique, du carter de la pompe, du filtre, du carter du moteur et du couple de décharge. Selon les conditions de travail, la durée de vie de ces pièces peut varier de manière significative et peut être inférieure à la période légale de garantie.