Construction of an office building, Spreeport

The Project:


Construction of an office building, 1st construction phase


Executing company:

HOCHTIEF Construction AG, Niederlassung Berlin

Responsible for setting up the construction site and for the technical equipment:

STREIF Baulogistik GmbH, Niederlassung Ost


The Problem:


Pumping off the storm water arising on the roofs during the construction phase.


Our Solution:


Eight type KTVE21.5 pumps with integrated electrode controls were installed in the shafts. The slim electrodes, which are attached, replace float sensors which take a lot of space and are maintenance-intensive. Only the motor line of the pump has to be relaid; no additional cables for float switches have to be connected.

En cas d'utilisation abrasive et corrosive, une usure plus important se manifestera naturellement dans certains composants. En rapport avec l'application ci-dessus, l'usure peut principalement apparaître au niveau de la turbine, de l'agitateur, du panneau d'aspiration, de la chemise d'arbre, de la bague de graissage, du joint mécanique, du carter de la pompe, du filtre, du carter du moteur et du couple de décharge. Selon les conditions de travail, la durée de vie de ces pièces peut varier de manière significative et peut être inférieure à la période légale de garantie.
À cet égard, veuillez tenir compte de nos conditions générales que nous pouvons également vous envoyer par e-mail si vous le souhaitez.