Direkt zum Inhalt | Direkt zur Navigation
Vous êtes ici :

Bramschstraße tunnel - Dresden, Germany

The Project:


North-tangent Dresden-Gorbitz, Bramschstraße tunnel, Germany

Executing Company:

MAX BÖGL Group of companies

Postfach 1120

D-92310 Neumarkt

info@max-boegl.de

www.max-boegl.de


The Problem:


The tunnel lies in the ground water over its whole length. No free water table exists near the tunnel, the flow-in quantities depend on the distribution of the local flow quantities from top and vertical joints which extend as far as the main ground water course.


Our Solution:


KTZ35.5 is used in 24-hour pumping on snore mode. Because cement sludge and abrasive media are pumped here it is necessary to apply a highly wear resistant pump.

En cas d'utilisation abrasive et corrosive, une usure plus important se manifestera naturellement dans certains composants. En rapport avec l'application ci-dessus, l'usure peut principalement apparaître au niveau de la turbine, de l'agitateur, du panneau d'aspiration, de la chemise d'arbre, de la bague de graissage, du joint mécanique, du carter de la pompe, du filtre, du carter du moteur et du couple de décharge. Selon les conditions de travail, la durée de vie de ces pièces peut varier de manière significative et peut être inférieure à la période légale de garantie.
À cet égard, veuillez tenir compte de nos conditions générales que nous pouvons également vous envoyer par e-mail si vous le souhaitez.