ARGE tunnel Achrain, Austria
The Project:
Construction of a 3,200 m long road tunnel
Executing companies:
ARGE Tunnel Achrain/Österreich
Beton- u. Monierbau Gesellschaft m.b.H.
Alpine Mayreder Bau GmbH
Jäger Bau GmbH
The Problem:
Drainage during the complete tunnel heading work.
Our Solution:
Use of type KTZ32.2 submersible pumps. These are operated in 24-hour snore mode.
Thanks to their special properties including their internal rotating mechanical seal and upstream shaft protection sleeve with seal, the Tsurumi pumps can be operated in 24-hour snore mode.
The advantages of this design are:
- Extended service lives
- Lower costs for spare parts
- Lower labour costs
En cas d'utilisation abrasive et corrosive, une usure plus important se manifestera naturellement dans certains composants. En rapport avec l'application ci-dessus, l'usure peut principalement apparaître au niveau de la turbine, de l'agitateur, du panneau d'aspiration, de la chemise d'arbre, de la bague de graissage, du joint mécanique, du carter de la pompe, du filtre, du carter du moteur et du couple de décharge. Selon les conditions de travail, la durée de vie de ces pièces peut varier de manière significative et peut être inférieure à la période légale de garantie.
À cet égard, veuillez tenir compte de nos
conditions générales que nous pouvons également vous envoyer par e-mail si vous le souhaitez.