Danube power plant, Asten, Austria

The project:


Installation of a drain pump for the turbine inspection chamber.


Executing companies:

Verbund Austrian Hydro Power AG

Sonnek Engineering GmbH (Tsurumi partner)


The problem:


For inspection work the turbine must be completely drained at the intake and discharge including the headrace tunnel. New turbines are integrated in the collector shaft. Depending on the inspection cycle, the unfiltered water from the Danube must be pumped away there.

Pump requirement: 300m3/h at 3bar. Until now clean water submersible pumps were implemented which were always at risk of silting.


The solution:


Implementation of a type LH845 high-pressure pump with a 45kW rating. This conveys the existing pressure line at a pressure of 2.8bar 5m3/min.

Tsurumi contractors' pumps are perfectly suited for dirty media which means that they can also be operated after flooding (extreme silting).

En el caso de utilizarse con productos abrasivos y corrosivos, determinados componentes sufrirán un desgaste más intenso de forma natural. En relación con la aplicación indicada más arriba, dicho desgaste se puede producir principalmente en el impulsor, el agitador, la placa de succión, el casquillo del eje, el anillo de engrase, el sello mecánico, la carcasa de la bomba, el colador, la carcasa del motor y el acoplamiento de descarga. En función de las condiciones de trabajo, la vida útil de estas piezas puede variar significativamente y puede ser inferior al período de garantía legal.