Pipe heading Aakerfährstraße, Germany

The Project:


Pipe heading DN1200 Aakerfährstraße, Duisburg, Germany

Executing company:

Siebert Bauunternehmung GmbH, Bebra



The Problem:


Lowering and maintaining the groundwater table. At the beginning several medium-sized pumps were employed which burdened the mains electricity supply excessively. As the river Rhine flows past at a distance of 200m the groundwater could only be lowered with difficulty.


Our Solution:


A pump of type KRS2-89 incl. hosepipe and 300m drainage in the form of a pipe. Draining of the excavation for the whole construction period. Operation of the pump in 24-hour pumping on snore mode.

En el caso de utilizarse con productos abrasivos y corrosivos, determinados componentes sufrirán un desgaste más intenso de forma natural. En relación con la aplicación indicada más arriba, dicho desgaste se puede producir principalmente en el impulsor, el agitador, la placa de succión, el casquillo del eje, el anillo de engrase, el sello mecánico, la carcasa de la bomba, el colador, la carcasa del motor y el acoplamiento de descarga. En función de las condiciones de trabajo, la vida útil de estas piezas puede variar significativamente y puede ser inferior al período de garantía legal.
En este sentido, son de aplicación nuestros términos y condiciones generales, que también le podemos enviar por correo electrónico si lo solicita.